Our inside walls are also complete, as is all framing on the inside of the building.
In the playroom we have a walk-in closet and a powder room. Both have pocket doors on them to maximize space. The playroom also has a "tray ed" ceiling that goes up on an angle. This rook our ceiling height from 8'9" to almost 11' making a big difference in how large the room feels.
The office has a walk in closet and access to a full bath. The bathroom is also directly accessible from the outside, making it a very convenient pool bath. We have also added a tray ed ceiling in this room to maximize the space available.
We are very please with how this turned out. Steve suggested the tray ed ceilings and the costs for them was less than $1k to the project. It really does make a huge difference.
They are going to put a base coat of pain on the addition and will be installing windows and doors shortly.