Friday, October 12, 2007

AC in place ... almost
Progress has been a little slow this week. Although we culminated the week with the AC unit being installed. I guess we underestimated how much room the ducting would take. Basically, our entire attic has been consumed by duct work :( ...
The system has 3 zones, the playroom, the office and in the future, the lanai area. Each will be on it's own thermostat and we will be able to maintain different temperatures in each area. The whole thing is a little more expensive, maybe $1k, but it will allow us to control each thing independently, and will make (in my opinion) a more comfortable solution.
They're doing so low-voltage stuff today, and we should be ready for insulation next week.